02.08.24
Progress update at the No.204 project.
project
No.204
date
02.08.2024
At No. 204, the project is in its final stages, with only two and a half weeks left until completion. The focus now is on the finishing touches, including painting, floor finishes, external window and door trims, and brick slip pointing. These final details are crucial as they bring together the extensive internal and external upgrades made to the property.
Over the past five months, No. 204 has undergone significant transformations. Internal alterations were made to reconfigure and open up both the ground and first floors, creating a more functional and open living space. Additionally, the property has received substantial thermal upgrades, including floor and loft insulation, new windows and doors, and a complete façade overhaul. The external insulation has been enhanced with new render and brick slip finishes, dramatically changing the home's appearance.
The project has aimed not only to modernize the layout but also to improve the energy efficiency and aesthetic appeal of the house. With these final touches, the client is eagerly anticipating moving into their newly renovated home, which now combines contemporary design with enhanced performance and comfort.
The near completion of No. 204 represents the culmination of a comprehensive renovation effort that has successfully transformed the property inside and out.
For a more detailed look at the story of No.204, visit the ‘projects’ page on our website.